by Gail on May 2, 2017
Case Study: How two people (and legions of talented tradespeople) are building a new green home in British Columbia.
(To find a specific post, click on the Index of Posts tab, above.)
Contact: glunt57 at gmail dot com
To date (August 27, 2013) we've spent $817,531. We've also saved $258,557 by doing tasks ourselves (and WWOOF labour) and scouring back alleys, thrift stores, landfills and Craigslist for free and cheap stuff. Included in that total are taxes saved by building before the HST, buying used, and doing our own labour ($37,012.) By doing the general contracting, we have saved a minimum of $113,761 in general contractor's overhead on the total cost of building plus $13,450 which represents the HST we didn't pay on the overhead.
See the whole breakdown here.
M | T | W | T | F | S | S |
---|---|---|---|---|---|---|
« May | ||||||
1 | ||||||
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | 29 |
30 |
Get smart with the Thesis WordPress Theme from DIYthemes.
{ 0 comments… add one now }