I call this "carpenter's notepaper." This little notes are left all around the building site.

I call this "carpenter's notepaper." These little notes are left all around the building site.

The basement floor will be acid stained, so just needs to be cleaned of debris and given a 30-grit sanding. Willard and Sean took about 2 hours to do this with a very heavy sander.

The basement floor will be acid stained, so just needs to be cleaned of debris and given a 30-grit sanding. Willard and Sean took about 2 hours to do this with a very heavy sander.

The Craigslist-sourced studio doors and windows were installed into the styrofoam block concrete walls.

The Craigslist-sourced studio doors and windows were installed into the styrofoam block concrete walls.

The storage bin has been emptied of tools, materials, raingear, oddments of Craigslist harvesting and shelving in preparation for bin pickup.