Here’s the latest “look”. The roof rafters are mostly on, and window framing is nearly complete. The main entry roof, parallel to the dormer roof, has yet to be framed.
The weather deities smiled on us for two wonderfully clear (little wind, no rain) days. We met with tradespeople, and D even became a 15-minute expert on building forms (for footings for pillars to hold up entry roof- he was the “steel re-bar guy”.)

In other news, we have learned from the Highways department that Hydro’s permit application to dig a new trench to install a connection duct should be processed within a week, so we’re hoping Hydro will be on top of it, since the promised connection could not be found by Hydro. Hydro will have to pay for the connection. The crew has been building for more than 4 months with no electrical connection (running off a generator.)